Integrated Systems Testing
Integrated Systems Testing (IST) ensures fire and life safety systems work together as designed—an essential step in securing occupancy and regulatory approval. With dozens of interconnected systems often involved, each project outlines the specific systems tested to meet code compliance and performance standards.
HIGH COMPLEXITY

Canada Life Building
Toronto, Ontario | 2024 | 237,000 sq. ft.
Overview:
The Canada Life Building underwent a fire alarm system replacement. As the construction timeline exceeded expectations, our team became the trusted advisor for the client, providing valuable recommendations and guidance throughout the process.
Integrated Fire and Life Safety Systems tested:
• Electromagnetic Locks
• Elevator Recall
• Fan Shut-down
• Fire Alarm
• Fire Do Not Enter
• Fire Pump
• Interconnected Buildings
• Kitchen Suppression
• Life Safety Generator
• Life Safety Transfer Scheme
• Loss of Power
• Overhead door release
• Pre-action
• Stair Pressurization Fan
• Standpipe
• Tunnel Pressurization Fan
• Wet Sprinkler
Role:
Lonergan Engineering reviewed the design and provided detailed mark-ups of all integrations identified during site investigations. Our recommendations were followed by design professionals, and instructions were issued to address design omissions that could have jeopardized a successful permit close.

Co-operators Insurance HQ
Guelph, Ontario | 2024 | 226,000 sq. ft.
Overview:
This new 3-storey office building is designed as a Zero Carbon Building, LEED Gold, and WELL Platinum. Despite the extended construction timeline, our team quickly became the trusted partner for the client, offering advice and recommendations to ensure successful project completion.
Integrated Fire and Life Safety Systems tested:
• Auto Door Release
• Elevator Recall
• Fire Alarm
• Fire Pump
• Fire Sprinklers
• HVAC Shut-down
• Kitchen Suppression
• Life Safety Generator
• Life Safety Transfer Scheme
• Loud Speaker Shutdown
• Pre-action
• Smoke Dampers
• Smoke Exhaust
• Sound Masking Shutdown
• Turnstile Release
Role:
Lonergan Engineering reviewed the project design and marking up integrations found through site investigations. We provided expert recommendations to ensure that design omissions were addressed and issued instructions to avoid risks that could impact the successful closure of permits.

Hard Rock Casino & Hotel
Gloucester, Ontario | 2025 | 300,000 sq. ft. | $350M project
Overview:
A multiphased expansion and renovation of the existing casino complex, including a 61,000 sq. ft. addition, 51,000 sq. ft. renovation, 91,000 sq. ft. six-story hotel, 29,000 sq. ft. of restaurants, and a 39,000 sq. ft. theatre. Lonergan Engineering fast-tracked a draft Integrated Testing Plan (ITP) to secure the City of Ottawa’s conditional building permit.
Integrated Fire and Life Safety Systems tested:
• Electromagnetic Locks
• Elevator Recall
• Fan Shut-down
• Theatre Shutdown
• Audio / Video Shutdown
• Kitchen Suppression System
• Fire Alarm
• Fire Pump Outbuilding
• Freeze Protection
• Lighting Control
• Smoke Venting
• Smoke Dampers
• Life Safety Generator
• Life Safety Transfer Scheme
• Sprinkler
• Door Hold Open
• Pre Action Systems
• Interconnected Fire Alarm Panels
Role:
Lonergan Engineering represented the owner, coordinated with design professionals, and prevented common testing errors.
Scope of Work:
• Expedited release of a conditional building permit
• Integrated testing per ULC S1001 standards

Sinclair Centre
Vancouver, British Columbia | 2024 | 550,000 sq. ft.
Overview:
The Sinclair Centre was a retroactive integrated systems testing project.The project required Government security clearance of “reliability status”for all team members. The facility consists of four historical buildings, mall concourse levels, and a connection to the Vancouver subway system. It is equipped with eight fire alarm networked nodes and is classified as a high-rise building. It houses critical government offices, including CRA, passport offices, RCMP, and Canada Border Customs, among others.
Integrated Fire and Life Safety Systems tested:
• Delayed Egress
• Electromagnetic Locks
• Elevator Recall
• Fan Shut-down
• Fire Alarm
• Fire Pump
• Interconnected Buildings
• Life Safety Generator
• Life Safety Transfer Scheme
• Overhead door release
• Pre-action
• Sprinkler (wet/dry)
• Stair Pressurization Fan
Role:
Lonergan Engineering conducted a comprehensive site investigation to assess fire and life safety integrations. Using data collection, site examination, historical drawings, reports, and more, our team was able to prepare an Integrated Systems Test Plan and successfully execute the integrated systems testing.
MODERATE COMPLEXITY

Delmanor Aurora Retirement Living
Aurora, Ontario | 2021 | 265,000 sq. ft.
Overview:
A 265,000 sq. ft. retirement living facility with a dedicated patient-assist floor. Lonergan Engineering led Integrated Testing Coordination, educating the team, crafting detailed schedules, and troubleshooting system interconnections to secure ULC listing.
Integrated Fire and Life Safety Systems tested:
• Door Hold Open
• Electromagnetic Locks
• Elevator Recall
• Fan Shut-down
• Fire Alarm
• Fire Pump
• Kitchen Suppression
• Life Safety Generator
• Life Safety Transfer Scheme
• Lighting Override
• Nurse call
• Smoke Venting CACF Rm
• Sprinkler
Role:
Lonergan Engineering facilitated planning meetings, supported RFIs and site instructions for OBC compliance, fielded AHJ inquiries, and provided on-site troubleshooting to achieve successful integrated testing.

Lee Manor
Owen Sound, Ontario | 2022 | 90,000 sq. ft.
Overview:
A Long Term Care facility, which includes nurse call systems and mental health wards. We conducted a full building review, identifying non-compliant or incomplete integrations, such as issues with the kitchen exhaust system, elevator recall, maglock release, fire pump loss of power, and generator troubles. We directed contractors to make necessary corrections, streamlining the Integrated Systems Testing and ensuring compliance for occupancy.
Integrated Fire and Life Safety Systems tested:
• Door Hold Open
• Electromagnetic Locks
• Elevator Recall
• Fan Shut-down
• Fire Alarm
• Fire Pump
• Kitchen Suppression
• Life Safety Generator
• Life Safety Transfer Scheme
• Nurse call
• Sprinkler

Views of The Preserve (Mattamy Homes)
Oakville, Ontario | 2024 | 199,587 sq. ft.
Overview:
This project involved multiphased occupancy with Building A, Building B, and underground parking. We worked closely with the design professionals to help expedite the process, complete testing, and achieve a satisfactory Integrated Testing Report for final occupancy.
Integrated Fire and Life Safety Systems tested:
• CO System
• Electromagnetic Locks
• Elevator Recall
• Fan Shut-down
• Fire Alarm
• Freeze protection
• Life Safety Generator
• Life Safety Transfer Scheme
• Smoke Dampers
• Sprinkler
Role:
Lonergan Engineering liaised with the AHJ for questions related to thefacility. Our team completed the integrated systems testing per ULC S1001.

Zancor Centre
King City, Ontario | 2024 | 131,700 sq. ft.
Overview:
Zancor Centre is a new multi-use community recreation facility in King City. The center includes two ice pads, a field house, a multi-lane swimming pool, a full-size gymnasium, and more, designed to serve a variety of community needs.
Integrated Fire and Life Safety Systems tested:
• AV PA Shutdown
• Awning Retractor
• Building Management
• Fire Alarm
• Fire Pump
• Fire Sprinklers
• Freeze Protection
• Life Safety Generator
• Life Safety Transfer Scheme
• Smoke Dampers
• Snow Melting at Egress
Role:
Lonergan Engineering reviewed the design complete with a mark-up of all integrations found from site investigations.

Unifor National
North York, Ontario | 2020 | 300,000 sq. ft. | $515K project
Overview:
A full replacement of the occupied building’s fire alarm system, including a new control panel, annunciator panel, field devices, code corrections, and a two-stage voice communication system. The new system was installed in parallel and, once verified, the existing system was decommissioned without service interruption.
Integrated Fire and Life Safety Systems tested:
• Electromagnetic Locks
• Elevator Recall
• Fan Shut-down
• Fire Alarm
• Fire Pump
• Freeze Protection
• Life Safety Generator
• Life Safety Transfer Scheme
• Sprinkler
Role:
Lonergan Engineering designed and prepared contract documents, issued CCDC/payment certificates, managed construction, oversaw substantial completion, and conducted integrated testing per ULC S1001.
Scope of Work:
• Surveyed existing fire alarm system
• Designed new fire alarm system with detailed installation specifications
• Integrated testing per ULC S1001 standards
LOW COMPLEXITY

CIBC Square
Toronto, Ontario | 2025 | 620,000 sq. ft.
Overview:
The multiphased office tenant fit-out at CIBC Square, located at 141 Bay Street, spans floors P1, P2, 5-25. The project involves modifications to the existing building, ensuring integration of fire and life safety systems in the new tenant spaces.
Integrated Fire and Life Safety Systems tested:
• Elevator Recall
• Fire Alarm
• Fire Sprinklers
• HVAC Shut-down
• Magnetic Locks
• Smoke Dampers
• Turnstile Release
Role:
Lonergan Engineering reviewed the design, complete with a mark-up of all integrations found from site investigations.