Integrated Systems Test Plan / Questionnaire

Start your integrated systems test plan with Lonergan Engineering.

Please enable JavaScript in your browser to complete this form.

Introduction

Name

Data Collection

(123 ABC ST, Toronto ON)
(Ex. 3 levels below grade, 6 storeys above grade with penthouse)
(Hospital/Long Term Care/Office/School/Residential/Retirement Living)
(Provide an estimate if known, in sq.m.)
Type of integrated systems testing being performed:
What is the current status of the project?
Construction type:
Level of complexity:
List of applicable integrated systems:
(Check all that apply)
(Ex: The fire alarm system is a two-stage voice communication [manufacture & model number] system complete with smoke control and fire fighter handsets)
Building classification – Group A:
(Select all that apply)
Building classification – Group B:
(Select all that apply)
Building classification – Group C:
(Select all that apply)
Building classification – Group D:
(Select all that apply)
Building classification – Group E:
(Select all that apply)
Building classification – Group F:
(Select all that apply)

Project Contacts

(Building department)

Anticipated Project Schedule